AH Building Contractor was contacted to rectify this problem involving a full re-roof to both elevations.
Also a new velux installation to front side was required by customer following chimney repairs.
Please find photos and work listings on work carried out to this project.
- Supply and erect scaffolding.
- Remove all Ridge-tiles and all existing stone slates.
- Remove all batons from both elevations.
- Apply new none rot fully breathable roofing underlay to correct lap of 150mm.
- Fix new weather treated 2x1 laths to random coursed settings.
- Fix new velux window to front side elevation.
- Re-build base of chimney stack to make safe.
- Re-fix all stone slates and replace all damaged with new,
- Apply new code 4 lead to base of chimney stack.
- Re-bed and re-point all ridges to make secure and weather proof.
- Remove all waste and scaffolding to finish this project.